Construction Communication and Coordination Services
POD Project Experience

POD Project Experience

Through PSM²’s extensive work within Phoenix Airports, our team has honed a method for effectively communicating with our Stakeholders.  Our strategy results in a more united project team and bolstered public support for airport improvements.  Our team’s positive impacts are evident, and we are confident in our ability to continue to exceed Aviation Department Expectations. Below is a list of Phoenix Airport projects to which the PSM² POD team has contributed.

CAPITAL IMPROVEMENTS – Over 50 including:
  • Runway Improvements
  • Runway Safety Area Extensions
  • Taxiway Improvements, Reconstructions and Pavement Replacement
  • Terminal 2 Apron Rehabilitation
  • Terminal 3 Baggage Carousel Replacement
  • Terminal 3 Elevator Modernization
  • Terminal 3 and Terminal 4 Checkpoint Expansions
  • Terminal 4 Fire Alarm Upgrades
  • West Hold Bay Reconstruction
  • West Runway Safety Area Improvements
  • PHX Sky Train™
  • Signage Master Plan Implementation
  • Taxiway Alpha – Phase 2 Reconstruction
  • Terminal 3 Parking Garage Lighting and Facility Improvements
  • Terminal 4 Food And Beverage Infrastructure Improvements

JOB ORDER CONTRACT PROJECTS – Over 277 including:
  • 24th Street Westbound Overlay
  • Buckeye Road Pavement Replacement
  • East Economy Overflow Lot Pavement
  • East Side Cargo Building A Pavement
  • Executive Terminal and West Cell Phone Lot Overlay
  • Facilities & Services Fuel Pumps Upgrades
  • Facilities & Services Trash Collection Area and Compactors
  • Landside Pavement Repairs and Treatments
  • Old Tower Road Asphalt Pavement Rehabilitation
  • Rental Car Center Bus Route Paving Repairs
  • Parking Lot Surface Treatments
  • Sky Harbor Boulevard Paving Repairs
  • Taxi-Limo Building Improvements and Variable Message System
  • Taxiway G and H Utility Adjustments, Infield Paving
  • and Signage Replacement
  • Terminal 2 Garage Paving
  • Terminal 2 Parking Garage Modifications
  • Terminal 3 Baggage Claim Terrazzo Flooring
  • Terminal 3 Exterior ADA Modifications
  • Terminal 3 Service Elevator
  • Terminal 3 West Crossover Deck Repairs
  • Terminal 3 West End Office Repairs
  • Terminals 3 and 4 Janitorial Closets Rehabilitation
  • Terminals 3 and 4 Raised Crosswalks
  • Terminal 4 Customs Global Entry Office
  • Terminal 4 Food and Beverage Concessions
  • Terminal 4 Jet Bridge B23 Ground Power Unit Upgrades
  • Terminal 4 N4 Concourse Jet Bridge Refurbishment
  • Terminal 4 S4 Concourse Restroom Remodels
  • Terminal 4 Service Elevators 7 & 8 Modernization
  • Terminal 4 Southwest Toll Plaza Expansion Joint Replacement
  • West Economy Lot Repairs
  • West Sky Harbor LUST Soil Characterization
  • TENANT IMPROVEMENTS – Over 256 including:
    • ATCT
    • State Route 143/Sky Harbor Boulevard
    • Terminal 4 Concessions Phase 1 and Phase 2

    PHOENIX AVIATION DIVISION PROJECTS
    • Facilities and Services Maintenance
    • Environmental Remediation, Abatement and Monitoring
    • Technology Maintenance
    • Business and Properties Advertisement Work
    • Task Forces: Customer Service, Signage, Website, Security
    • Emergency Signage
    • Super Bowl 2008 Planning
    • Rock N’ Roll Marathon Planning
    • Security Level Alert
    • Proposition 201 Implementation
    • Storm Damage Response 2008
    • Valley Metro CAB – Aviation Department Representative
    • City of Phoenix Water Department Sewer Relining
    • ACAMS
    • 800 Mhz
    • Cell Phone Lots
    • Emergency Preparedness Drill
    • Triennial Drill
    • Airline Relocations & Mergers